PRODUCTION SCHEDULE
|
|
WEEK 1
|
Narrative planning
– creating a mind map with the initial ideas which we then converted into the
main brief initial idea.
Logo design –
logo designed on the paper at first and then converted into a real design
using Adobe Photoshop CS6. Looked at other logo designs to get idea of good
logos
Credits –
Research into credits which sparked ideas of what our own credits could look
like. Created later on using Adobe after effects.
Storyboard and
script writing – after creating the initial idea we wrote our script and
the character list which then helped to make the storyboard easier.
|
WEEK 2
|
Research into sound
(other products and own) – Research into the sounds used in horror films
and what creates good emotion in the film. We were able to find warranty free
sound websites to download sound for our own film.
Interview questions
and interview for roles – created interview questions for the role of the
news reported reader in the film and carried out film interviews with two
potential candidates.
Recce pictures –
took pictures of potential locations for filming and made a decision on where
would be the best place to film based on what we could use in our narrative.
Character analysis
– created the breakdown for the characters involved in our films and their
specific personalities etc.
|
WEEK 3
|
Film the voice over of news report which we will then
later on add it to the film to make the narrative appear as though it is a
real life situation. Filmed a fews takes in order to get the best quality
possible.
|
HALF TERM
|
|
WEEK 4
|
Makeup and prop
research – research into iconography and makeup in famous horror films. Makeup
research of clowns in order to get the best possible result and to make the
clown as scary as possible.
Filming –
filming to take place in order to give us time for potential re-film and
editing time. Filming to take place at 17:00 to make sure lighting outside is
not too dark, but just dark enough to create an eerie tone.
Editing of filming
and gathering feedback – Edit the film together with the sound. We the
check that it looks how we want it to look and then gain feedback from target
audience so that we have time to make any changes to the film based on how
they want it to appear.
|
WEEK 5
|
Re-filming –
re-filming to to take place in order to make our film the best quality
possible and to make sure it appeals to our target audience as much as
possible.
|
WEEK 6
|
Editing – Edit the
second draft together with sound and gather more feedback in order to reassure
ourselves that it is the best possible quality it can be and make sure it
fits our target audiences expectations.
|
WEEK 7
|
Evaluation question
– Plan and create evaluation questions 1-3. Edit together/create what is
needed in order to make it more appealing and look as creative as possible.
|
WEEK 8
|
Evaluation question
– Plan and create evaluation questions 4-7. Then edit together/create it to
look as appealing and creative as possible.
|
WEEK 9
|
Make finishing touches to blog and make it look
presentable.
|
Showing posts with label Time Management. Show all posts
Showing posts with label Time Management. Show all posts
Wednesday, 11 January 2017
Production schedule
Wednesday, 16 November 2016
Editing log
Log of when editing took place and whom by-
After re-film:
11/11/16.
11/11/16.
Editing by Callum Ison.
Start 19:00
Finish 20:30
Start 19:00
Finish 20:30
What took place?
The clips filmed on this day were added to WeVideo and then we merged them together without any sound yet. The clips were added together to gather a sense of continuity and establish what was happening in the film in a smooth way.
12/11/16
12/11/16
Editing by (main) Callum Ison, (Subs)Joe Deighton, Harriett Folan and Jade Moon
Start 14:25
Finish 15:20
What took place?
We edited the diegetic and non diegetic sound into the film in order the film more scary and also link the film to the horror genre further.
15/11/16
We edited the diegetic and non diegetic sound into the film in order the film more scary and also link the film to the horror genre further.
15/11/16
Start 11:15
Finish 12:10
What took place?
Sound was re-edited in order to make the tension in the film build as the music begins quietly and gradually becomes louder. More news reporter voices added in order to make the action seem more frantic and make the audience begin to panic.
16/11/16
Thursday, 10 November 2016
Forecast for refilm of main brief
10th November
Sunrise: 7:11 AM
Sunset: 4:17 PM
Sunrise: 7:11 AM
Sunset: 4:17 PM
From checking the forecast on 10th November, we then new that the sun would begin to set at 4:17pm. Therefore, we decided to begin our refilming when it was completely dark for continuity to make our opening look professional.
Sun and some clouds with a shower in the area.
7°c
Precipitation 41%
Precipitation 41%
We thought that due to the clouds and the showers, the filming conditions would suit us best as it would get darker quickly and we can gain digetic sounds of the eerie winds when we film our exterior, point of view shots.
Friday, 4 November 2016
Filming day
November 4th - Our first filming day
Once we arrived at our filming location, our main actor and extras began to get their theatrical make-up on whilst we set up the camera and prepared everything ready to start filming. We ran through our storyboard once again to remind us what shots we want to get. We began filming at approximately 4:30pm and by this time, it was dark outside meaning we had to take into consideration continuity throughout to give it a sense of realism. It rained whilst filming but luckily we had finished all of the shots we needed outside before the rain started. We finished filming at around 6:00pm.
Monday, 31 October 2016
Subscribe to:
Posts (Atom)


